Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 37 results ...

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Ackerman, P J, Jr. (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

  • Type: Thesis
  • Keywords: accessibility; failure; personnel; indoor air quality; schools; air quality; asset management; deterioration; infrastructure management; manufacturing; inspection
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1897601259
  • Abstract:
    The Asbestos Hazard Emergency Response Act (AHERA) requires public schools to manage asbestos containing materials. Twenty five years after AHERA was enacted public schools continue to struggle with documenting and managing asbestos containing material assets. In addition, the manufacturing of lead based paint (LBP) was banned over thirty years ago yet public schools continue to have to manage LBP assets with no guidelines specific to public schools. When compared to current civil infrastructure asset management systems, AHERA and the HUD guidelines lack a rating system based on visual inspection data. The development of a condition index algorithm and risk of failure model would provide school planners an efficient management tool to predict the future condition of asbestos containing material and lead based paint assets. As a result, school planners would be able to prioritize maintenance, repair, and abatement projects based on the risk to the indoor air quality of their facilities and more efficiently utilize their limited resources to mitigate such risks. This paper presents initial work toward the development of a visual condition index algorithm and a risk of failure model to support prioritization of maintenance, repair, and abatement projects. The condition assessment categories provided by AHERA and HUD were adapted and incorporated in an evaluation form created to assist in rating the various stages of accessibility, deterioration, and detection of typical ACM and LBP building components. The evaluation form can be utilized by inspection and school personnel when reclassifying ACM and LBP components during semi-annual inspections of their facilities and also ensure the repeatability of the condition assessment and risk of failure methodologies. A risk of failure model was developed utilizing the FMEA process, specifically the calculation of a risk priority number (RPN). Three schools were selected for a field pilot study to develop the accessibility, deterioration, detection, and RPN algorithms and evaluate for repeatability. The algorithms will provide a quantitative and consistent means for documenting the condition and RPN of asbestos containing material and lead based paint assets and allow the condition of these assets to be monitored and reclassified over a period of time.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, Q (2007) An object model framework for interface management in building information models, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, J S (1995) Reliability-based design of a retaining wall, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Mitchell, Z W, Jr. (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Novak, V M (2012) Managing sustainability value in design: A systems approach, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pinero, J C (2003) A framework for monitoring performance-based road maintenance, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Platt, R T (1998) Development of a ready-to-assemble construction system, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Prateapusanond, A (2004) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Sands, K S, II (2014) Ethics education and its relationship to undergraduate construction students' professional ethical sensitivity, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.